TAP136159
Substation-AdjacentCrow Wing County, Minnesota · MISO
TAP136159 is a substation-adjacent datacenter candidate site in Crow Wing County, Minnesota, interconnecting through MISO. It screens at 53.7/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Crow Wing County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Crow Wing County | Greenfield | — | — | 1.4 yrs | 62.8 |
| EC Coal Crow Wing County | Greenfield | — | — | 1.4 yrs | 60.5 |
| TAP136156 | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 60.1 |
| RIVERTON 230/115 KV | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 60.1 |
| EC Coal Crow Wing County | Greenfield | — | — | 1.4 yrs | 59.9 |
| EC Coal Crow Wing County | Greenfield | — | — | 1.4 yrs | 59.5 |
| OZ Crow Wing | Greenfield | — | — | 1.4 yrs | 59.0 |
| BRAINERD | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen