TAP139687 is a substation-adjacent datacenter candidate site in Chisago County, Minnesota, interconnecting through MISO. It screens at 53.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Chisago County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CHISAGO | Substation-Adjacent | 500 kV | 1,000 MW | 2.8 yrs | 65.6 |
| EC Near North Branch (MN) | Greenfield | — | — | 1.4 yrs | 62.8 |
| EC Near North Branch (MN) | Greenfield | — | — | 1.4 yrs | 62.3 |
| EC Near North Branch (MN) | Greenfield | — | — | 1.4 yrs | 62.3 |
| EC Near North Branch (MN) | Greenfield | — | — | 1.4 yrs | 62.1 |
| EC Near North Branch (MN) | Greenfield | — | — | 1.4 yrs | 62.0 |
| EC Near North Branch (MN) | Greenfield | — | — | 1.4 yrs | 61.8 |
| EC Near North Branch (MN) | Greenfield | — | — | 1.4 yrs | 61.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP139687, Chisago County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.