Bridgepoint Park-Buildings 2 & 3

Industrial

Carver County, Minnesota · MISO

DC Readiness
55.8
Good / 100

Bridgepoint Park-Buildings 2 & 3 is an industrial datacenter candidate site in Carver County, Minnesota, interconnecting through MISO. It screens at 55.8/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityNORTHERN STATES POWER CO - MINNESOTAinvestor ownedmoderate to large load · terms ≥ 100 MWMinnesota large-load statute (2025): DCs pay own costs, no cross-subsidy

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPStream Data Centers - MN I
IXP distance7.6 mi
Fiber providers17
Fiber coverage85.4%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterStream Data Centers - MN I
DC distance7.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.13¢/kWh
Industrial electricity10.18¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$8,140

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Bridgepoint Park-Buildings 2 & 3

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
93
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Carver County, ranked by DC Readiness.

Sites near Bridgepoint Park-Buildings 2 & 3
SiteTypeVoltageCapacityQueue waitScore
BLUFF CREEKSubstation-Adjacent115 kV100 MW2.8 yrs62.9
UNKNOWN170707Substation-Adjacent115 kV100 MW2.8 yrs62.0
UNKNOWN129670Substation-Adjacent115 kV100 MW2.8 yrs61.4
UNKNOWN130233Substation-Adjacent115 kV100 MW2.8 yrs61.1
UNKNOWN129675Substation-Adjacent115 kV100 MW2.8 yrs61.1
Greenfield (UNKNOWN129735 - BLUE LAKE)Greenfield230 kV300 MW2.8 yrs61.0
Greenfield (UNKNOWN129735 - BLUE LAKE)Greenfield230 kV300 MW2.8 yrs59.6
Seminary Fen/Assumption CKIndustrial——2.8 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.