UNKNOWN130176

Substation-Adjacent

Becker County, Minnesota · MISO

DC Readiness
55.4
Good / 100

UNKNOWN130176 is a substation-adjacent datacenter candidate site in Becker County, Minnesota, interconnecting through MISO. It screens at 55.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN130176
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityCITY OF DETROIT LAKES - (MN)not available

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXP702 Communications - Moorhead, MN
IXP distance44.0 mi
Fiber providers11
Fiber coverage72.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenter702 Communications - Moorhead, MN
DC distance44.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.04¢/kWh
Industrial electricity9.05¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,413

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN130176

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Becker County, ranked by DC Readiness.

Sites near UNKNOWN130176
SiteTypeVoltageCapacityQueue waitScore
AUDOBON 230KVSubstation-Adjacent230 kV300 MW2.8 yrs61.7
OZ BeckerGreenfield——1.4 yrs57.7
UNKNOWN129786Substation-Adjacent115 kV100 MW2.8 yrs57.4
TAP135629Substation-Adjacent115 kV100 MW2.8 yrs57.1
TAP135630Substation-Adjacent115 kV100 MW2.8 yrs56.9
TAP135631Substation-Adjacent115 kV100 MW2.8 yrs56.8
TAP135632Substation-Adjacent69 kV50 MW2.8 yrs55.4
UNKNOWN130174Substation-Adjacent69 kV50 MW2.8 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN130176, Becker County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.