UNKNOWN133510
Substation-AdjacentNorfolk County, Massachusetts · ISO-NE
UNKNOWN133510 is a substation-adjacent datacenter candidate site in Norfolk County, Massachusetts, interconnecting through ISO-NE. It screens at 60.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Norfolk County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| ANP BELLINGHAM ENERGY PROJECT | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 72.9 |
| ANP BELLINGHAM ENERGY PROJECT | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 69.8 |
| TAP136343 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 69.6 |
| WEST MEDWAY | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 68.0 |
| HYDE PARK | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 67.6 |
| UNKNOWN133458 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 67.2 |
| NORTH ATTLEBORO | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 66.9 |
| WALPOLE | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 66.9 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN133510, Norfolk County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.