Norfolk County, Massachusetts · ISO-NE

DC Readiness
60.6
Good / 100

TAP136265 is a substation-adjacent datacenter candidate site in Norfolk County, Massachusetts, interconnecting through ISO-NE. It screens at 60.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP136265
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneISONE_MA
Wholesale LMP$69.64/MWh
Utility commercial rate0.17¢/kWh

Speed to power

ISO / RTO regionISO-NE
Queue depth32
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPColoSpace - Rockland, MA
IXP distance6.6 mi
Fiber providers9
Fiber coverage81.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance401.3 mi

Site characteristics

Parcel ownerTran Que Tam T Etal
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteATLANTIC SWITCHBOARD ENGINEERING
Hazard sub-score53/100
Construction cost index134.2 (avg 100)

Location context

Nearest datacenterColoSpace - Rockland, MA
DC distance6.6 mi
Nearest rail0.2 mi
Nearest gas pipeline1.4 mi
Nearest fiber route15.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity16.56¢/kWh
Industrial electricity16.31¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$20,134

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
37
Fiber connectivity12%
92
Energy cost10%
57
Water risk8%
90
Natural hazard8%
53
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
38
Construction cost3%
38
Gas pipeline2%
95
Tax incentive2%
0
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Norfolk County, ranked by DC Readiness.

Sites near TAP136265
SiteTypeVoltageCapacityQueue waitScore
ANP BELLINGHAM ENERGY PROJECTSubstation-Adjacent345 kV600 MW3.5 yrs72.9
ANP BELLINGHAM ENERGY PROJECTSubstation-Adjacent345 kV600 MW3.5 yrs69.8
TAP136343Substation-Adjacent345 kV600 MW3.5 yrs69.6
WEST MEDWAYSubstation-Adjacent345 kV600 MW3.5 yrs68.0
HYDE PARKSubstation-Adjacent345 kV600 MW3.5 yrs67.6
UNKNOWN133458Substation-Adjacent230 kV300 MW3.5 yrs67.2
NORTH ATTLEBOROSubstation-Adjacent115 kV100 MW3.5 yrs66.9
WALPOLESubstation-Adjacent230 kV300 MW3.5 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP136265, Norfolk County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.