Haverhill Solar Power Project

Brownfield

Essex County, Massachusetts · ISO-NE

DC Readiness
59.8
Good / 100

Haverhill Solar Power Project is a brownfield datacenter candidate site in Essex County, Massachusetts, interconnecting through ISO-NE. It screens at 59.8/100 DC Readiness with a catalogued 1 MW of candidate capacity.

Power & interconnection

Substation distance1.2 mi
Available capacity1 MW
LMP zoneISONE_NEMA
Wholesale LMP$47.20/MWh
Utility commercial rate0.16¢/kWh

Speed to power

ISO / RTO regionISO-NE
Queue depth32

Connectivity

Nearest IXPNavisite Andover
IXP distance8.7 mi
Fiber providers8
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance422.2 mi

Site characteristics

Site typeBrownfield
Acreage5 ac
Land owner typeprivate
Buildability75.0/100
Former usepower_plant
Existing capacity1 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteBRENTWOOD FUNITURE INC
Hazard sub-score68/100
Construction cost index117.0 (avg 100)

Location context

Nearest datacenterNavisite Andover
DC distance8.7 mi
Nearest rail0.2 mi
Nearest gas pipeline0.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity16.43¢/kWh
Industrial electricity16.09¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$20,111

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
43
Speed to power15%
31
Fiber connectivity12%
90
Energy cost10%
65
Water risk8%
90
Natural hazard8%
68
Buildability7%
75
Labor market4%
50
DC cluster4%
80
Land / acreage3%
26
Construction cost3%
53
Gas pipeline2%
98
Tax incentive2%
0
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Essex County, ranked by DC Readiness.

Sites near Haverhill Solar Power Project
SiteTypeVoltageCapacityQueue waitScore
TAP137045Substation-Adjacent345 kV600 MW3.5 yrs69.6
SOUTH BROADWAYSubstation-Adjacent115 kV100 MW3.5 yrs65.2
NORTH READINGSubstation-Adjacent115 kV100 MW3.5 yrs64.9
WEST ANDOVERSubstation-Adjacent115 kV100 MW3.5 yrs64.7
TAP136225Substation-Adjacent115 kV100 MW3.5 yrs64.4
TAP137040Substation-Adjacent115 kV100 MW3.5 yrs64.3
RISER174342Substation-Adjacent115 kV100 MW3.5 yrs64.3
WEST SALEMSubstation-Adjacent115 kV100 MW3.5 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Haverhill Solar Power Project, Essex County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.