BELL ROCK ROAD

Substation-Adjacent

Bristol County, Massachusetts · ISO-NE

DC Readiness
52.4
Fair / 100

BELL ROCK ROAD is a substation-adjacent datacenter candidate site in Bristol County, Massachusetts, interconnecting through ISO-NE. It screens at 52.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBELL ROCK ROAD
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneISONE_MA
Wholesale LMP$69.64/MWh
Utility commercial rate0.17¢/kWh

Speed to power

ISO / RTO regionISO-NE
Queue depth32
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPProv.net 935
IXP distance17.7 mi
Fiber providers7
Fiber coverage32.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance384.3 mi

Site characteristics

Parcel ownerFall River City Of
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteALLERGAN FALL RIVER
Hazard sub-score58/100
Construction cost index108.6 (avg 100)

Location context

Nearest datacenterCrown Castle Providence (235 Promenade)
DC distance17.8 mi
Nearest rail1.9 mi
Nearest gas pipeline2.7 mi
Nearest fiber route58.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity17.41¢/kWh
Industrial electricity16.54¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$21,221

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
37
Fiber connectivity12%
28
Energy cost10%
58
Water risk8%
92
Natural hazard8%
58
Buildability7%
45
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
60
Gas pipeline2%
91
Tax incentive2%
0
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Bristol County, ranked by DC Readiness.

Sites near BELL ROCK ROAD
SiteTypeVoltageCapacityQueue waitScore
HATHAWAY STREETSubstation-Adjacent115 kV100 MW3.5 yrs65.5
TAP135387Substation-Adjacent115 kV100 MW3.5 yrs64.8
TAUNTON TAPSubstation-Adjacent115 kV100 MW3.5 yrs64.2
Greenfield (BERRY STREET - FALL RIVER (345)Greenfield345 kV600 MW3.5 yrs62.6
SOMERSETSubstation-Adjacent115 kV100 MW3.5 yrs62.4
SYKES ROADSubstation-Adjacent115 kV100 MW3.5 yrs62.3
TAP135391Substation-Adjacent115 kV100 MW3.5 yrs61.9
TAP136647Substation-Adjacent115 kV100 MW3.5 yrs61.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BELL ROCK ROAD, Bristol County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.