102 Key Street, Bock Oil

Industrial

Washington County, Maryland · PJM

DC Readiness
50.8
Fair / 100

102 Key Street, Bock Oil is an industrial datacenter candidate site in Washington County, Maryland, interconnecting through PJM. It screens at 50.8/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth308
Avg queue wait3.8 yrs

Connectivity

Nearest IXPRagingWire VA2 - NTT
IXP distance44.9 mi
Fiber providers6
Fiber coverage69.7%

Site characteristics

Site typeIndustrial

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 178331621
DC distance24.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity8.49¢/kWh
Industrial electricity7.56¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$8,668

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
30
Fiber connectivity12%
70
Energy cost10%
50
Water risk8%
84
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near 102 Key Street, Bock Oil
SiteTypeVoltageCapacityQueue waitScore
Forty West LandfillBrownfield2 MW3.8 yrs64.3
EC Coal Washington CountyGreenfield3.5 yrs60.2
OZ WashingtonGreenfield3.5 yrs59.8
EC Coal Washington CountyGreenfield3.5 yrs58.3
EC Coal Washington CountyGreenfield3.5 yrs58.3
EC Coal Washington CountyGreenfield3.5 yrs58.1
UNKNOWN122882Substation-Adjacent230 kV300 MW3.8 yrs58.0
EC Coal Washington CountyGreenfield3.5 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for 102 Key Street, Bock Oil, Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.