Former Mine site at 38.559, -76.947

Former Mine

Charles, Maryland · PJM

DC Readiness
50.4
Fair / 100

At a glance

Former Mine site at 38.559, -76.947 is a former mine datacenter candidate site in Charles, Maryland, scoring 50.4/100 DC Readiness — 48th of 53 scored sites in the county. It sits in the PJM grid region and the SOUTHERN MARYLAND ELEC COOP INC service territory, where interconnection has averaged 5.3 years from request to operation.

Power & interconnection

UtilitySOUTHERN MARYLAND ELEC COOP INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 5.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth308
Avg queue wait5.3 yrs
Recent queue wait5.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPAiNET DC-900S
IXP distance23.8 mi
Fiber providers4
Fiber coverage87.5%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 00260996040
DC distance18.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity8.04¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$7,951

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Former Mine site at 38.559, -76.947 compare with other sites in Charles?

Former Mine site at 38.559, -76.947 ranks 48th of 53 scored candidate sites in Charles. Its 50.4/100 is roughly in line with the county average of 54.8. It is roughly in line with the Maryland average of 52.9 and roughly in line with the national average of 53.2.

Against the Maryland average, its strongest sub-score is fiber connectivity (79 vs 72) and its weakest is power availability (30 vs 39). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Former Mine site at 38.559, -76.947 to power, fiber and other datacenters?

The nearest located transmission bottleneck is POSSUMP4 TX1 XFORMER H 500 KV (PJM), 18 miles away. For connectivity, the nearest internet exchange facility is AiNET DC-900S at 23.8 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 00260996040, 18.9 miles away.

What are the flood, water and hazard risks at Former Mine site at 38.559, -76.947?

At the county level, FEMA's National Risk Index rates Charles "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
35
Fiber connectivity12%
79
Energy cost10%
50
Water risk7%
84
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Charles, ranked by DC Readiness.

Sites near Former Mine site at 38.559, -76.947
SiteTypeVoltageCapacityQueue waitScore
Morgantown Generating PlantBrownfield230 kV1,418 MW5.3 yrs66.4
HAWKINS GATESubstation-Adjacent230 kV300 MW5.3 yrs60.4
MORGANTOWNSubstation-Adjacent230 kV300 MW5.3 yrs60.1
RYCEVILLESubstation-Adjacent230 kV300 MW5.3 yrs59.8
OZ CharlesGreenfield——5.3 yrs59.7
OZ CharlesGreenfield——5.3 yrs59.7
OZ CharlesGreenfield——5.3 yrs57.8
EC Coal Charles CountyGreenfield——5.3 yrs56.4

Former Mine site at 38.559, -76.947: common questions

What is the DC Readiness score of Former Mine site at 38.559, -76.947?

Former Mine site at 38.559, -76.947 scores 50.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 48th of 53 scored sites in Charles. The Charles average is 54.8 and the Maryland average is 52.9.

Which electric utility serves Former Mine site at 38.559, -76.947?

SOUTHERN MARYLAND ELEC COOP INC (cooperative) holds the retail service territory that contains the site.

What grid region is Former Mine site at 38.559, -76.947 in?

Former Mine site at 38.559, -76.947 is in the PJM region. Projects interconnecting there have averaged a 5.3-year wait from queue request to operation.

How far is Former Mine site at 38.559, -76.947 from an internet exchange?

The nearest internet exchange facility is AiNET DC-900S, about 23.8 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Former Mine site at 38.559, -76.947, Charles, MD”, https://gridcensus.com/datacenter-sites/maryland/charles/mine-site-d5e19184 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Mine site at 38.559, -76.947, Charles is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.