Mine Site

Former Mine

Baltimore, Maryland · PJM

DC Readiness
44.9
Fair / 100

Mine Site is a former mine datacenter candidate site in Baltimore, Maryland, interconnecting through PJM. It screens at 44.9/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth304

Connectivity

Nearest IXPExpedient Baltimore - Owings Mills
IXP distance9.3 mi

Site characteristics

Site typeFormer Mine
Former useMining: Stone; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterExpedient Owings Mills
DC distance9.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity9.93¢/kWh
Industrial electricity8.79¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$13,587

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
67
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Baltimore, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
CONASTONESubstation-Adjacent500 kV1,000 MW3.1 yrs77.1
UNKNOWN123099Substation-Adjacent115 kV100 MW3.1 yrs71.7
UNKNOWN123100Substation-Adjacent115 kV100 MW3.1 yrs71.5
NOTCH CLIFFSubstation-Adjacent115 kV100 MW3.1 yrs70.8
TAP139113Substation-Adjacent115 kV100 MW3.1 yrs70.2
TAP170894Substation-Adjacent115 kV100 MW3.1 yrs69.9
Greenfield (TAP139322 - CONASTONE)Greenfield500 kV1,000 MW3.1 yrs69.5
Greenfield (TAP139322 - CONASTONE)Greenfield500 kV1,000 MW3.1 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Baltimore. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.