Ouachita, Louisiana · MISO

DC Readiness
53.3
Fair / 100

FROSTKRAFT is a substation-adjacent datacenter candidate site in Ouachita, Louisiana, interconnecting through MISO. It screens at 53.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFROSTKRAFT
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityENTERGY LOUISIANA LLCinvestor ownedfavorable to large load · terms ≥ 50 MWLarge-load contracts with dedicated generation (Meta Richland Parish) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth120
Avg queue wait2.8 yrs

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance92.6 mi
Fiber providers9
Fiber coverage47.8%

Site characteristics

Land contactOuachita Parish County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score42/100

Location context

Nearest datacenterDartPoints Shreveport, LA - SHV1
DC distance92.6 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.33¢/kWh
Industrial electricity9.70¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$4,018

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track FROSTKRAFT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
48
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
88
Natural hazard6%
42
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Ouachita, ranked by DC Readiness.

Sites near FROSTKRAFT
SiteTypeVoltageCapacityQueue waitScore
STERLINGTONSubstation-Adjacent500 kV1,000 MW2.8 yrs62.0
Monroe (LA)Brownfield138 MW1.4 yrs58.4
OZ OuachitaGreenfield1.4 yrs57.8
EC Near Plant 31 Paper MillGreenfield1.4 yrs57.2
UNKNOWN112561Substation-Adjacent115 kV100 MW2.8 yrs56.7
EC Near Plant 31 Paper MillGreenfield1.4 yrs56.4
EC Near Monroe (LA)Greenfield1.4 yrs56.4
EC Near SterlingtonGreenfield1.4 yrs56.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.