UNKNOWN123914

Substation-Adjacent

Muhlenberg County, Kentucky · PJM

DC Readiness
55.2
Good / 100

UNKNOWN123914 is a substation-adjacent datacenter candidate site in Muhlenberg County, Kentucky, interconnecting through PJM. It screens at 55.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN123914
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityKENTUCKY UTILITIES COinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEnergynet Datacenter
IXP distance32.3 mi
Fiber providers3
Fiber coverage29.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterDynamics Mining
DC distance17.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.94¢/kWh
Industrial electricity5.85¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$4,571

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN123914

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
37
Fiber connectivity12%
56
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Muhlenberg County, ranked by DC Readiness.

Sites near UNKNOWN123914
SiteTypeVoltageCapacityQueue waitScore
PARADISESubstation-Adjacent500 kV1,000 MW3.8 yrs68.3
GREEN RIVERSubstation-Adjacent161 kV100 MW3.8 yrs58.3
EC Near ParadiseGreenfield3.6 yrs56.9
EC Near Green RiverGreenfield3.6 yrs56.1
TAP155281Substation-Adjacent161 kV100 MW3.8 yrs55.7
EC Coal Muhlenberg CountyGreenfield3.6 yrs55.4
EC Coal Muhlenberg CountyGreenfield3.6 yrs55.3
TAP153698Substation-Adjacent161 kV100 MW3.8 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN123914, Muhlenberg County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.