Southwest One Industrial Park -- Build Ready Site

Shovel-Ready

Marshall County, Kentucky · PJM

DC Readiness
51.7
Fair / 100

Southwest One Industrial Park -- Build Ready Site is a shovel-ready datacenter candidate site in Marshall County, Kentucky, interconnecting through PJM. It screens at 51.7/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth221

Connectivity

Nearest IXPQuad State Internet PAH1 Colocation
IXP distance24.0 mi

Site characteristics

Site typeShovel-Ready
Acreage147 ac
Former useBuild-ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterQuad State Internet PAH1 Colocation
DC distance24.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.20¢/kWh
Industrial electricity6.40¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$5,272

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
50
Fiber connectivity12%
47
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
62
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Marshall County, ranked by DC Readiness.

Sites near Southwest One Industrial Park -- Build Ready Site
SiteTypeVoltageCapacityQueue waitScore
CUMBERLAND 500KVSubstation-Adjacent500 kV1,000 MW4.6 yrs76.5
UNKNOWN155633Substation-Adjacent161 kV100 MW4.6 yrs69.2
MARSHALLSubstation-Adjacent500 kV1,000 MW4.6 yrs67.5
Greenfield (MARSHALL - CUMBERLAND 500KV)Greenfield500 kV1,000 MW4.6 yrs67.4
HARDINSubstation-Adjacent161 kV100 MW3.7 yrs67.2
Greenfield (MARSHALL - CUMBERLAND 500KV)Greenfield500 kV1,000 MW4.6 yrs66.9
CALVERTSubstation-Adjacent161 kV100 MW4.6 yrs65.1
Greenfield (MARSHALL - SHAWNEE)Greenfield500 kV1,000 MW4.6 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Southwest One Industrial Park -- Build Ready Site, Marshall County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.