Site B- Eddyville Industrial Park- Build Ready Site

Shovel-Ready

Lyon County, Kentucky · PJM

DC Readiness
49.0
Fair / 100

Site B- Eddyville Industrial Park- Build Ready Site is a shovel-ready datacenter candidate site in Lyon County, Kentucky, interconnecting through PJM. It screens at 49.0/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPQuad State Internet PAH1 Colocation
IXP distance33.9 mi
Fiber providers3
Fiber coverage34.1%

Site characteristics

Site typeShovel-Ready
Acreage27 ac
Former useBuild-ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterDynamics Mining
DC distance31.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.63¢/kWh
Industrial electricity6.17¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$4,987

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
32
Fiber connectivity12%
59
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Lyon County, ranked by DC Readiness.

Sites near Site B- Eddyville Industrial Park- Build Ready Site
SiteTypeVoltageCapacityQueue waitScore
EC FFE Lyon CountyGreenfield3.6 yrs54.5
BARKLEYSubstation-Adjacent161 kV100 MW3.8 yrs53.8
Mine SiteFormer Mine3.8 yrs50.3
TAP160440Substation-Adjacent69 kV50 MW3.8 yrs50.2
UNKNOWN122972Substation-Adjacent69 kV50 MW3.8 yrs50.1
UNKNOWN157923Substation-Adjacent69 kV50 MW3.8 yrs49.9
UNKNOWN122966Substation-Adjacent69 kV50 MW3.8 yrs49.6
Site A- Eddyville Industrial Park- Build Ready SiteShovel-Ready3.8 yrs49.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Site B- Eddyville Industrial Park- Build Ready Site, Lyon County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.