Carrs -- Site 135-006

Shovel-Ready

Lewis, Kentucky · PJM

DC Readiness
46.9
Fair / 100

Carrs -- Site 135-006 is a shovel-ready datacenter candidate site in Lewis, Kentucky, interconnecting through PJM. It screens at 46.9/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityFLEMING-MASON ENERGY COOP INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEncore Technologies NOR1
IXP distance64.5 mi
Fiber providers2
Fiber coverage12.3%

Site characteristics

Site typeShovel-Ready
Acreage1,086 ac
Buildable load (est.)~4341,086 MWland-based
Former useSecondary

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterEncore Technologies NOR1
DC distance64.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.96¢/kWh
Industrial electricity7.52¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$2,517

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Carrs -- Site 135-006

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
37
Fiber connectivity12%
52
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
62
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Lewis, ranked by DC Readiness.

Sites near Carrs -- Site 135-006
SiteTypeVoltageCapacityQueue waitScore
EC Coal Lewis CountyGreenfield3.6 yrs51.8
OZ LewisGreenfield3.6 yrs51.5
EC Coal Lewis CountyGreenfield3.6 yrs50.8
UNKNOWN121308Substation-Adjacent69 kV50 MW3.8 yrs49.9
UNKNOWN121309Substation-Adjacent69 kV50 MW3.8 yrs49.8
EC FFE Lewis CountyGreenfield3.6 yrs48.9
Tollesboro -- Site 135-003Shovel-Ready3.8 yrs46.4
Black Oak Industrial Park | Vanceburg-Lewis CountyShovel-Ready3.8 yrs46.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.