Skip to content
Gridcensus

UNKNOWN121529

Substation-Adjacent

Johnson County, Kentucky · PJM

DC Readiness
57.2
Good / 100

UNKNOWN121529 is a substation-adjacent datacenter candidate site in Johnson County, Kentucky, interconnecting through PJM. It screens at 57.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN121529
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEast Kentucky Network Data Center
IXP distance10.4 mi
Fiber providers1
Fiber coverage91.5%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterEast Kentucky Network Datacenter
DC distance10.3 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.36¢/kWh
Industrial electricity8.96¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$3,144

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
32
Fiber connectivity12%
79
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Johnson County, ranked by DC Readiness.

Sites near UNKNOWN121529
SiteTypeVoltageCapacityQueue waitScore
EC Coal Johnson CountyGreenfield3.6 yrs60.9
EC Coal Johnson CountyGreenfield3.6 yrs58.3
EC Coal Johnson CountyGreenfield3.6 yrs58.3
EC Coal Johnson CountyGreenfield3.6 yrs58.2
EC Coal Johnson CountyGreenfield3.6 yrs57.9
THELMA (AEP)Substation-Adjacent138 kV100 MW3.8 yrs57.5
EC Coal Johnson CountyGreenfield3.6 yrs56.9
UNKNOWN121295Substation-Adjacent69 kV50 MW3.8 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN121529, Johnson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.