Elizabethtown Site 093-018

Shovel-Ready

Hardin County, Kentucky · SERC

DC Readiness
53.9
Fair / 100

Elizabethtown Site 093-018 is a shovel-ready datacenter candidate site in Hardin County, Kentucky, interconnecting through SERC. It screens at 53.9/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityKENTUCKY UTILITIES COinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth175
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPBluegrassNet Louisville
IXP distance41.7 mi
Fiber providers5
Fiber coverage80.0%

Site characteristics

Site typeShovel-Ready
Acreage187 ac
Buildable load (est.)~75–187 MWland-based
Land contactHardin County Assessor
Former useSecondary

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterBluegrassNet Louisville
DC distance41.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.80¢/kWh
Industrial electricity6.67¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$5,886

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Elizabethtown Site 093-018

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
57
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
62
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Hardin County, ranked by DC Readiness.

Sites near Elizabethtown Site 093-018
SiteTypeVoltageCapacityQueue waitScore
HARDINSubstation-Adjacent345 kV600 MW3.9 yrs65.7
UNKNOWN127827Substation-Adjacent138 kV100 MW3.9 yrs59.9
TAP160469Substation-Adjacent138 kV100 MW3.9 yrs59.8
UNKNOWN127841Substation-Adjacent138 kV100 MW3.9 yrs59.7
UNKNOWN127856Substation-Adjacent69 kV50 MW3.9 yrs58.4
EC FFE Hardin CountyGreenfield——4.7 yrs57.9
CENTRAL HARDINSubstation-Adjacent138 kV100 MW4.7 yrs57.7
UNKNOWN127822Substation-Adjacent69 kV50 MW3.9 yrs57.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Elizabethtown Site 093-018, Hardin County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.