Skip to content
Gridcensus

Grayson County, Kentucky · PJM

DC Readiness
50.9
Fair / 100

TAP155579 is a substation-adjacent datacenter candidate site in Grayson County, Kentucky, interconnecting through PJM. It screens at 50.9/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP155579
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLost River Data Center
IXP distance36.1 mi
Fiber providers6
Fiber coverage75.9%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterLost River Data Center
DC distance36.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.48¢/kWh
Industrial electricity6.14¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$3,703

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
32
Fiber connectivity12%
40
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Grayson County, ranked by DC Readiness.

Sites near TAP155579
SiteTypeVoltageCapacityQueue waitScore
EC Coal Grayson CountyGreenfield3.6 yrs57.6
TAP155580Substation-Adjacent138 kV100 MW3.8 yrs54.4
UNKNOWN155591Substation-Adjacent138 kV100 MW3.8 yrs53.2
EC Coal Grayson CountyGreenfield3.6 yrs51.8
UNKNOWN124712Substation-Adjacent69 kV50 MW3.8 yrs50.9
UNKNOWN124711Substation-Adjacent69 kV50 MW3.8 yrs50.9
TAP160446Substation-Adjacent69 kV50 MW3.8 yrs50.9
UNKNOWN157769Substation-Adjacent69 kV50 MW3.8 yrs50.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.