Gallatin, Kentucky · PJM

DC Readiness
57.8
Good / 100

MUNK is a substation-adjacent datacenter candidate site in Gallatin, Kentucky, interconnecting through PJM. It screens at 57.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMUNK
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityOWEN ELECTRIC COOP INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCyrusOne Florence
IXP distance14.5 mi
Fiber providers2
Fiber coverage82.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterCyrusOne Florence
DC distance14.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.15¢/kWh
Industrial electricity6.60¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$3,786

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Get alerts

Track MUNK

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
32
Fiber connectivity12%
84
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Gallatin, ranked by DC Readiness.

Sites near MUNK
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125283Substation-Adjacent69 kV50 MW3.8 yrs56.0
UNKNOWN140115Substation-Adjacent69 kV50 MW3.8 yrs56.0
TAP140267Substation-Adjacent69 kV50 MW3.8 yrs56.0
TAP160604Substation-Adjacent69 kV50 MW3.8 yrs55.9
Glencoe -- Site 077-019Shovel-Ready——3.8 yrs52.8
Warsaw Industrial ParkShovel-Ready——3.8 yrs52.5
SpartaShovel-Ready——3.8 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for MUNK, Gallatin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.