Skip to content
Gridcensus

Bullitt County, Kentucky · PJM

DC Readiness
54.7
Fair / 100

TAP155738 is a substation-adjacent datacenter candidate site in Bullitt County, Kentucky, interconnecting through PJM. It screens at 54.7/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP155738
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySALT RIVER ELECTRIC COOP CORPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPFlexential - Louisville/Downtown (LOU02/03/04)
IXP distance22.1 mi
Fiber providers3
Fiber coverage70.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterFlexential Louisville - Downtown
DC distance22.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.98¢/kWh
Industrial electricity7.73¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$7,883

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP155738

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
37
Fiber connectivity12%
76
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Bullitt County, ranked by DC Readiness.

Sites near TAP155738
SiteTypeVoltageCapacityQueue waitScore
MILL CREEK STATIONSubstation-Adjacent345 kV600 MW3.8 yrs67.5
UNKNOWN129145Substation-Adjacent345 kV600 MW3.8 yrs64.6
UNKNOWN129144Substation-Adjacent161 kV100 MW3.8 yrs57.8
UNKNOWN129148Substation-Adjacent161 kV100 MW3.8 yrs57.5
UNKNOWN129151Substation-Adjacent138 kV100 MW3.8 yrs57.5
TAP138390Substation-Adjacent69 kV50 MW3.8 yrs56.4
UNKNOWN129152Substation-Adjacent69 kV50 MW3.8 yrs56.4
UNKNOWN130727Substation-Adjacent69 kV50 MW3.8 yrs56.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155738, Bullitt County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.