Boyle, Kentucky · PJM

DC Readiness
50.1
Fair / 100

TAP155526 is a substation-adjacent datacenter candidate site in Boyle, Kentucky, interconnecting through PJM. It screens at 50.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP155526
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPQX.Net Lexington
IXP distance32.4 mi
Fiber providers2
Fiber coverage67.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterQX.Net Lexington
DC distance32.4 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.99¢/kWh
Industrial electricity7.30¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$5,423

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
32
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Boyle, ranked by DC Readiness.

Sites near TAP155526
SiteTypeVoltageCapacityQueue waitScore
EC Coal Boyle CountyGreenfield3.6 yrs58.8
EC FFE Boyle CountyGreenfield3.6 yrs57.1
OZ BoyleGreenfield3.6 yrs56.1
UNKNOWN125673Substation-Adjacent138 kV100 MW3.8 yrs52.5
Davco Industrial SiteShovel-Ready3.8 yrs50.6
Norfolk Southern-- Site 021-005Shovel-Ready3.8 yrs50.6
John H. Stigall Business CenterShovel-Ready3.8 yrs50.6
TAP155522Substation-Adjacent69 kV50 MW3.8 yrs50.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155526, Boyle. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.