UNKNOWN109520

Substation-Adjacent

Allen, Kentucky · PJM

DC Readiness
53.0
Fair / 100

UNKNOWN109520 is a substation-adjacent datacenter candidate site in Allen, Kentucky, interconnecting through PJM. It screens at 53.0/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN109520
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLost River Data Center
IXP distance32.1 mi
Fiber providers4
Fiber coverage99.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterMeta Gallatin Data Center
DC distance30.4 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.09¢/kWh
Industrial electricity6.31¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$5,163

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track UNKNOWN109520

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
37
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Allen, ranked by DC Readiness.

Sites near UNKNOWN109520
SiteTypeVoltageCapacityQueue waitScore
SCOTTSVILLESubstation-Adjacent161 kV100 MW3.8 yrs56.8
UNKNOWN109521Substation-Adjacent161 kV100 MW3.8 yrs56.7
SOUTH SCOTTSVILESubstation-Adjacent161 kV100 MW3.8 yrs56.5
Smalling Industrial ParkShovel-Ready3.8 yrs52.6
Allen Springs Industrial ParkShovel-Ready3.8 yrs52.6
Scottsville -- Holt Drive SiteShovel-Ready3.8 yrs49.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.