Mine Site is a former mine datacenter candidate site in Graham County, Kansas, interconnecting through PJM. It screens at 44.8/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityPRAIRIE LAND ELECTRIC COOP INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPBeloit-NOC
IXP distance87.0 mi
Fiber providers1
Fiber coverage100.0%

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterCloud Storage Corp
DC distance46.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.15¢/kWh
Industrial electricity9.74¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$1,393

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Graham County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118076Substation-Adjacent115 kV100 MW3.3 yrs55.9
UNKNOWN119861Substation-Adjacent115 kV100 MW3.3 yrs54.3
UNKNOWN117970Substation-Adjacent115 kV100 MW3.3 yrs52.7
Morland Community FoundationIndustrial——3.3 yrs48.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Graham County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.