Franklin has 36 scored datacenter candidate sites averaging 53.6/100 DC Readiness, with a catalogued aggregate of 312 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

36
Candidate sites
53.6/100
Avg DC Readiness
312 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Franklin

Site-selection context for Franklin

Yesproperty_tax_exemption
Datacenter tax incentive
10.79¢/kWh
Commercial electricity
9.64¢/kWh
Industrial electricity
4
Fiber providers
Medium-High
Water stress
$3,444
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

By site type

Top datacenter sites in Franklin

Top datacenter sites in Franklin
SiteTypeVoltageCapacityQueue waitScore
EC Near OttawaGreenfield3.5 yrs60.3
EC Near OttawaGreenfield3.5 yrs60.1
EC Near OttawaGreenfield3.5 yrs60.0
EC Near OttawaGreenfield3.5 yrs59.4
EC Near OttawaGreenfield3.5 yrs59.3
EC Near OttawaGreenfield3.5 yrs58.6
OZ FranklinGreenfield3.5 yrs58.6
EC Near OttawaGreenfield3.5 yrs58.5
EC Near OttawaGreenfield3.5 yrs58.3
OZ FranklinGreenfield3.5 yrs57.8
EC Near OttawaGreenfield3.5 yrs56.8
OttawaBrownfield12 MW3.5 yrs56.5
EC Near OttawaGreenfield3.5 yrs55.2
EC Near OttawaGreenfield3.5 yrs55.0
UNKNOWN118128Substation-Adjacent161 kV100 MW3.3 yrs52.7
UNKNOWN118131Substation-Adjacent161 kV100 MW3.3 yrs52.7
Former AME ChurchIndustrial3.3 yrs50.8
SWAN Arts CenterIndustrial3.3 yrs50.8
124 S MainIndustrial3.3 yrs50.8
Hickory BTAIndustrial3.3 yrs50.8
Ottawa North Street BTA #4Industrial3.3 yrs50.7
Butler BuildingIndustrial3.3 yrs50.7
Ottawa Enterprise BTA #3Industrial3.3 yrs50.7
Ottawa North Street BTA #3Industrial3.3 yrs50.7
Ottawa Enterprise BTA #4Industrial3.3 yrs50.7

Franklin datacenter FAQ

How many datacenter sites are in Franklin?
36 scored datacenter candidate sites, averaging 53.6/100 DC Readiness.
Does Franklin offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Franklin?
FEMA's National Risk Index rates Franklin as "Relatively High" (score 35).
What are industrial electricity rates in Franklin?
Average industrial electricity is 9.64¢/kWh and commercial is 10.79¢/kWh in Franklin.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Franklin, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.