HICKORY CREEK

Substation-Adjacent

Dubuque County, Iowa · MISO

DC Readiness
58.8
Good / 100

HICKORY CREEK is a substation-adjacent datacenter candidate site in Dubuque County, Iowa, interconnecting through MISO. It screens at 58.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationHICKORY CREEK
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityINTERSTATE POWER AND LIGHT COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth112
Avg queue wait2.8 yrs

Connectivity

Nearest IXPUSSHC
IXP distance17.9 mi
Fiber providers12
Fiber coverage79.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterUSSHC
DC distance17.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.51¢/kWh
Industrial electricity8.58¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$10,692

Regulatory climate

Favorablestate posture · as of 2026-08

Strong incentives; utilities courting hyperscale load.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track HICKORY CREEK

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
30
Fiber connectivity12%
80
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
39
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Dubuque County, ranked by DC Readiness.

Sites near HICKORY CREEK
SiteTypeVoltageCapacityQueue waitScore
SALEMSubstation-Adjacent345 kV600 MW2.8 yrs63.7
EC Coal Dubuque CountyGreenfield——1.4 yrs61.9
EC Coal Dubuque CountyGreenfield——1.4 yrs61.7
EC Near DubuqueGreenfield——1.4 yrs61.1
UNKNOWN130699Substation-Adjacent161 kV100 MW2.8 yrs60.0
EC Coal Dubuque CountyGreenfield——1.4 yrs59.4
EC Near John Deere Dubuque WorksGreenfield——1.4 yrs59.3
EC Near DubuqueGreenfield——1.4 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for HICKORY CREEK, Dubuque County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.