Skip to content
Gridcensus

Substation-Adjacent site at 42.633, -95.145

Substation-Adjacent

Buena Vista, Iowa · MISO

DC Readiness
53.6
Fair / 100

At a glance

Substation-Adjacent site at 42.633, -95.145 is a substation-adjacent datacenter candidate site in Buena Vista, Iowa, scoring 53.6/100 DC Readiness — 28th of 36 scored sites in the county. Its nearest substation is UNKNOWN167969 (0 mi, 69 kV). It sits in the MISO grid region and the MIDAMERICAN ENERGY CO service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN167969
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityMIDAMERICAN ENERGY COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth112
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPSouth Spencer Aureon hut
IXP distance33.1 mi
Fiber providers11
Fiber coverage13.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterSouth Spencer Aureon hut
DC distance33.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.03¢/kWh
Industrial electricity7.39¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$11,332

Regulatory climate

Favorablestate posture · as of 2026-08

Strong incentives; utilities courting hyperscale load.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN167969

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 42.633, -95.145 compare with other sites in Buena Vista?

Substation-Adjacent site at 42.633, -95.145 ranks 28th of 36 scored candidate sites in Buena Vista. Its 53.6/100 is roughly in line with the county average of 55.0. It is roughly in line with the Iowa average of 56.4 and roughly in line with the national average of 53.2.

Against the Iowa average, its strongest sub-score is power availability (46 vs 37) and its weakest is fiber connectivity (54 vs 77). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 42.633, -95.145 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN167969, is about 0 miles away and operates at 69 kV. The nearest located transmission bottleneck is Raun_Tekamho_161kV_ftlo_Raun_Ft_Cal_345kV (MISO), 66 miles away. For connectivity, the nearest internet exchange facility is South Spencer Aureon hut at 33.1 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is South Spencer Aureon hut, 33.1 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 42.633, -95.145?

At the county level, FEMA's National Risk Index rates Buena Vista "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
50
Fiber connectivity12%
54
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
39
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Buena Vista, ranked by DC Readiness.

Sites near Substation-Adjacent site at 42.633, -95.145
SiteTypeVoltageCapacityQueue waitScore
EC Near Alta Municipal UtilitiesGreenfield——4.3 yrs57.9
EC Near Alta Municipal UtilitiesGreenfield——4.3 yrs57.7
EC Near Alta Municipal UtilitiesGreenfield——4.3 yrs57.4
EC Near Alta Municipal UtilitiesGreenfield——4.3 yrs57.3
UNKNOWN130442Substation-Adjacent161 kV100 MW4.3 yrs57.1
EC Near Alta Municipal UtilitiesGreenfield——4.3 yrs56.9
EC Near Alta Municipal UtilitiesGreenfield——4.3 yrs56.8
EC Near Alta Municipal UtilitiesGreenfield——4.3 yrs56.5

Substation-Adjacent site at 42.633, -95.145: common questions

What is the DC Readiness score of Substation-Adjacent site at 42.633, -95.145?

Substation-Adjacent site at 42.633, -95.145 scores 53.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 28th of 36 scored sites in Buena Vista. The Buena Vista average is 55.0 and the Iowa average is 56.4.

What is the nearest substation to Substation-Adjacent site at 42.633, -95.145?

The nearest mapped substation is UNKNOWN167969, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 42.633, -95.145?

MIDAMERICAN ENERGY CO (investor owned) holds the retail service territory that contains the site; its holding company is BERKSHIRE HATHAWAY ENERGY.

What grid region is Substation-Adjacent site at 42.633, -95.145 in?

Substation-Adjacent site at 42.633, -95.145 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Substation-Adjacent site at 42.633, -95.145 from an internet exchange?

The nearest internet exchange facility is South Spencer Aureon hut, about 33.1 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 42.633, -95.145, Buena Vista, IA”, https://gridcensus.com/datacenter-sites/iowa/buena-vista/unknown167969-6873fc23 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 42.633, -95.145, Buena Vista is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.