NIBLOCK EXCAVATING, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)

Manufacturing

WHITLEY, Indiana

DC Readiness
54.5
Fair / 100

NIBLOCK EXCAVATING, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING) is a manufacturing datacenter candidate site in WHITLEY, Indiana. It screens at 54.5/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPINdigital
IXP distance14.5 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterINdigital
DC distance14.5 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.79¢/kWh
Industrial electricity7.66¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,939

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
71
Energy cost10%
50
Water risk8%
90
Natural hazard8%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
41
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in WHITLEY, ranked by DC Readiness.

Sites near NIBLOCK EXCAVATING, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
E. WHITLEYSubstation-Adjacent345 kV600 MW3.0 yrs68.4
Greenfield (ROBISON PARK (345 KV) - SORENS)Greenfield345 kV600 MW3.0 yrs67.7
Greenfield (OLIVE - SORENSON)Greenfield345 kV600 MW2.2 yrs66.7
SATURNSubstation-Adjacent138 kV100 MW3.0 yrs66.3
Greenfield (SORENSON - DUMONT)Greenfield765 kV1,000 MW3.0 yrs65.2
TAP160239Substation-Adjacent138 kV100 MW3.0 yrs64.7
Greenfield (SORENSON - DUMONT)Greenfield765 kV1,000 MW3.0 yrs64.7
UNKNOWN123034Substation-Adjacent138 kV100 MW3.0 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NIBLOCK EXCAVATING, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING), WHITLEY. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.