Midwest Oil
IndustrialVIGO, Indiana · MISO
At a glance
Midwest Oil is an industrial datacenter candidate site in VIGO, Indiana, scoring 51.4/100 DC Readiness — 41st of 159 scored sites in the county. It sits in the MISO grid region and the DUKE ENERGY INDIANA, LLC service territory, where interconnection has averaged 3.0 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Get alerts
Track Midwest Oil
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Midwest Oil compare with other sites in VIGO?
Midwest Oil ranks 41st of 159 scored candidate sites in VIGO. Its 51.4/100 is roughly in line with the county average of 52.9. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.
Against the Indiana average, its strongest sub-score is speed to power (47 vs 46) and its weakest is fiber connectivity (73 vs 79). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Midwest Oil to power, fiber and other datacenters?
The nearest located transmission bottleneck is CIN23031_DRESSER_DRESS08ALE13_2_1 (MISO), 4 miles away. For connectivity, the nearest internet exchange facility is Indiana University Data Center at 51.6 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is IU Data Center, 51.6 miles away.
What are the flood, water and hazard risks at Midwest Oil?
At the county level, FEMA's National Risk Index rates VIGO "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in VIGO, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN124618 | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 67.3 |
| UNKNOWN124759 | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 63.2 |
| UNKNOWN124442 | Substation-Adjacent | 230 kV | 300 MW | 3.0 yrs | 62.8 |
| UNKNOWN124449 | Substation-Adjacent | 230 kV | 300 MW | 3.0 yrs | 61.6 |
| EC Near Sugar Creek Power | Greenfield | — | — | 3.0 yrs | 58.8 |
| EC Coal Vigo County | Greenfield | — | — | 3.0 yrs | 58.6 |
| EC FFE Vigo County | Greenfield | — | — | 3.0 yrs | 58.4 |
| EC Near Sugar Creek Power | Greenfield | — | — | 3.0 yrs | 58.4 |
Midwest Oil: common questions
What is the DC Readiness score of Midwest Oil?
Midwest Oil scores 51.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 41st of 159 scored sites in VIGO. The VIGO average is 52.9 and the Indiana average is 54.0.
Which electric utility serves Midwest Oil?
DUKE ENERGY INDIANA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.
What grid region is Midwest Oil in?
Midwest Oil is in the MISO region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.
How far is Midwest Oil from an internet exchange?
The nearest internet exchange facility is Indiana University Data Center, about 51.6 miles away; 7 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Midwest Oil, VIGO, IN”, https://gridcensus.com/datacenter-sites/indiana/vigo/midwest-oil-8cc66599 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Midwest Oil, VIGO is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.