Skip to content
Gridcensus

UNKNOWN123338

Substation-Adjacent

TIPPECANOE, Indiana · PJM

DC Readiness
61.3
Good / 100

UNKNOWN123338 is a substation-adjacent datacenter candidate site in TIPPECANOE, Indiana, interconnecting through PJM. It screens at 61.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN123338
Nearest grid bottleneckSIDOGASIDKEY · 112 km (MISO)
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPWintek Corporation
IXP distance2.1 mi
Fiber providers13
Fiber coverage94.8%

Site characteristics

Land contactTippecanoe County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterWintek Corporation
DC distance2.1 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.36¢/kWh
Industrial electricity8.27¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,601

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN123338

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
38
Fiber connectivity12%
98
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in TIPPECANOE, ranked by DC Readiness.

Sites near UNKNOWN123338
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123368Substation-Adjacent345 kV600 MW3.8 yrs65.8
DEQUINESubstation-Adjacent345 kV600 MW3.8 yrs65.8
LAFAYETTE 230Substation-Adjacent230 kV300 MW3.8 yrs65.2
OZ TippecanoeGreenfield3.0 yrs62.9
OZ TippecanoeGreenfield3.0 yrs62.6
LAFAYETTE CATEPILLARSubstation-Adjacent138 kV100 MW3.8 yrs62.4
EC Near CaterpillarGreenfield3.0 yrs62.3
PURDUE NORTHWESTSubstation-Adjacent138 kV100 MW3.8 yrs61.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN123338, TIPPECANOE. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.