Datacenter Sites in Switzerland County, Indiana

Switzerland County has 17 scored datacenter candidate sites averaging 61.4/100 DC Readiness, with a catalogued aggregate of 4,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

17
Candidate sites
61.4/100
Avg DC Readiness
4,300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for Switzerland County

Yessales_tax_exemption
Datacenter tax incentive
13.13¢/kWh
Commercial electricity
8.46¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$7,606
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in Switzerland County

Top datacenter sites in Switzerland County
SiteTypeVoltageCapacityQueue waitScore
GHENT STATIONSubstation-Adjacent345 kV600 MW3.0 yrs71.8
PIERCESubstation-Adjacent345 kV600 MW3.0 yrs67.3
GALLATINSubstation-Adjacent345 kV600 MW3.0 yrs66.7
UNKNOWN125062Substation-Adjacent138 kV100 MW3.0 yrs66.7
UNKNOWN124901Substation-Adjacent138 kV100 MW3.0 yrs65.8
Greenfield (GHENT STATION - TRIMBLE COUNTY)Greenfield345 kV600 MW3.0 yrs65.3
UNKNOWN125505Substation-Adjacent138 kV100 MW3.0 yrs64.6
HOOSIER FAIRVIEWSubstation-Adjacent138 kV100 MW3.0 yrs63.7
Greenfield (UNKNOWN124886 - CLIFTY CREEK)Greenfield345 kV600 MW3.0 yrs61.8
OZ SwitzerlandGreenfield3.0 yrs60.9
Greenfield (MIAMI - CLIFTY CREEK)Greenfield138 kV100 MW3.0 yrs58.6
Greenfield (UNKNOWN124901 - MARKLAND)Greenfield138 kV100 MW3.0 yrs58.3
Greenfield (UNKNOWN125465 - HOOSIER FAIRVI)Greenfield138 kV100 MW3.0 yrs56.8
Greenfield (GHENT STATION - TRIMBLE COUNTY)Greenfield345 kV600 MW3.0 yrs56.2
HILLTOP BASIC RESOURCES, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing54.7
SWITZERLAND HILLS, INC. (TRAVEL TRAILER AND CAMPER MANUFACTURING)Manufacturing54.0
BESI, INC. (NOT AVAILABLE)Manufacturing50.2

Switzerland County datacenter FAQ

How many datacenter sites are in Switzerland County?
17 scored datacenter candidate sites, averaging 61.4/100 DC Readiness.
Does Switzerland County offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in Switzerland County?
FEMA's National Risk Index rates Switzerland County as "Relatively Moderate" (score 32).
What are industrial electricity rates in Switzerland County?
Average industrial electricity is 8.46¢/kWh and commercial is 13.13¢/kWh in Switzerland County.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Switzerland County, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.