Skip to content
Gridcensus

SABRE MFG. (NOT AVAILABLE)

Manufacturing

Starke, Indiana

DC Readiness
53.9
Fair / 100

SABRE MFG. (NOT AVAILABLE) is a manufacturing datacenter candidate site in Starke, Indiana. It screens at 53.9/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityNORTHERN INDIANA PUB SERV COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPAunalytics South Bend Datacenter (AUSB)
IXP distance31.0 mi
Fiber providers9
Fiber coverage77.8%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterAmazon AWS Data Center
DC distance26.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.76¢/kWh
Industrial electricity8.58¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,178

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SABRE MFG. (NOT AVAILABLE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Starke, ranked by DC Readiness.

Sites near SABRE MFG. (NOT AVAILABLE)
SiteTypeVoltageCapacityQueue waitScore
EC Coal Starke CountyGreenfield——3.0 yrs59.5
OZ StarkeGreenfield——3.0 yrs58.7
UNKNOWN122924Substation-Adjacent138 kV100 MW3.8 yrs56.6
NORTON PACKAGING, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.5
KNOX FERTILIZER CO., INC. (FERTILIZER (MIXING ONLY) MANUFACTURING)Manufacturing——3.5 yrs53.9
KRUZ, INC. (TRUCK TRAILER MANUFACTURING)Manufacturing——3.5 yrs53.9
STELREMA CORP. (SURGICAL AND MEDICAL INSTRUMENT MANUFACTURING)Manufacturing——3.5 yrs53.9
HOOSIER CUSTOM PLASTICS, LLC (SPORTING AND ATHLETIC GOODS MANUFACTURING)Manufacturing——3.5 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SABRE MFG. (NOT AVAILABLE), Starke. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.