Skip to content
Gridcensus

Former Showers Administration Building

Industrial

Monroe County, Indiana · MISO

DC Readiness
56.5
Good / 100

Former Showers Administration Building is an industrial datacenter candidate site in Monroe County, Indiana, interconnecting through MISO. It screens at 56.5/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth170
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPIndiana University Data Center
IXP distance2.0 mi
Fiber providers11
Fiber coverage78.6%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterIU Data Center
DC distance2.0 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.10¢/kWh
Industrial electricity9.24¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,514

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Former Showers Administration Building

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
96
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Monroe County, ranked by DC Readiness.

Sites near Former Showers Administration Building
SiteTypeVoltageCapacityQueue waitScore
BLOOMINGTON (230KV)Substation-Adjacent345 kV600 MW3.0 yrs66.7
OZ MonroeGreenfield——3.0 yrs64.0
BLOOMINGTON ROGERS STSubstation-Adjacent138 kV100 MW3.0 yrs62.7
OZ MonroeGreenfield——3.0 yrs62.5
TAP139950Substation-Adjacent138 kV100 MW3.0 yrs61.8
UNKNOWN124851Substation-Adjacent138 kV100 MW3.0 yrs61.6
BLOOMINGTON ROCKPORTSubstation-Adjacent138 kV100 MW3.0 yrs61.6
UNKNOWN125080Substation-Adjacent138 kV100 MW3.0 yrs61.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Showers Administration Building, Monroe County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.