Skip to content
Gridcensus

MARION, Indiana · MISO

DC Readiness
61.6
Good / 100

At a glance

NORTHWEST is a substation-adjacent datacenter candidate site in MARION, Indiana, scoring 61.6/100 DC Readiness — 33rd of 900 scored sites in the county. Its nearest substation is NORTHWEST (0 mi, 138 kV). It sits in the MISO grid region and the INDIANAPOLIS POWER & LIGHT CO service territory, where interconnection has averaged 3.0 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationNORTHWEST
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityINDIANAPOLIS POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth170
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPIUPUI Informatics & Communications Technology Complex
IXP distance4.0 mi
Fiber providers20
Fiber coverage73.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterIUPUI Informatics & Communications Technology Complex
DC distance4.0 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.79¢/kWh
Industrial electricity10.09¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$11,101

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track NORTHWEST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does NORTHWEST compare with other sites in MARION?

NORTHWEST ranks 33rd of 900 scored candidate sites in MARION. Its 61.6/100 is roughly in line with the county average of 56.1. It is about 14% above the Indiana average of 54.0 and about 16% above the national average of 53.2.

Against the Indiana average, its strongest sub-score is power availability (58 vs 33) and its weakest is water (90 vs 90). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is NORTHWEST to power, fiber and other datacenters?

The nearest mapped substation, NORTHWEST, is about 0 miles away and operates at 138 kV. The nearest located transmission bottleneck is CIN23031_DRESSER_DRESS08ALE13_2_1 (MISO), 70 miles away. For connectivity, the nearest internet exchange facility is IUPUI Informatics & Communications Technology Complex at 4 miles. 20 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is IUPUI Informatics & Communications Technology Complex, 4 miles away.

What are the flood, water and hazard risks at NORTHWEST?

At the county level, FEMA's National Risk Index rates MARION "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
47
Fiber connectivity12%
92
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in MARION, ranked by DC Readiness.

Sites near NORTHWEST
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124504Substation-Adjacent345 kV600 MW3.0 yrs68.7
HANNASubstation-Adjacent345 kV600 MW3.0 yrs67.5
GUIONSubstation-Adjacent345 kV600 MW3.0 yrs67.3
SUNNYSIDESubstation-Adjacent345 kV600 MW3.0 yrs67.2
ROCKVILLESubstation-Adjacent345 kV600 MW3.0 yrs67.2
RISER167168Substation-Adjacent345 kV600 MW3.0 yrs67.0
UNKNOWN124474Substation-Adjacent230 kV300 MW3.0 yrs65.3
OZ MarionGreenfield——3.0 yrs64.8

NORTHWEST: common questions

What is the DC Readiness score of NORTHWEST?

NORTHWEST scores 61.6/100 on the GridCensus DC Readiness scale, rated good. It ranks 33rd of 900 scored sites in MARION. The MARION average is 56.1 and the Indiana average is 54.0.

What is the nearest substation to NORTHWEST?

The nearest mapped substation is NORTHWEST, about 0 miles away, at 138 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves NORTHWEST?

INDIANAPOLIS POWER & LIGHT CO (investor owned) holds the retail service territory that contains the site.

What grid region is NORTHWEST in?

NORTHWEST is in the MISO region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.

How far is NORTHWEST from an internet exchange?

The nearest internet exchange facility is IUPUI Informatics & Communications Technology Complex, about 4 miles away; 20 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “NORTHWEST, MARION, IN”, https://gridcensus.com/datacenter-sites/indiana/marion/northwest-a680ef92 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for NORTHWEST, MARION is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.