ROGERS GROUP, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)
ManufacturingLawrence County, Indiana
ROGERS GROUP, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING) is a manufacturing datacenter candidate site in Lawrence County, Indiana. It screens at 54.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Lawrence County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BEDFORD (345KV) | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 60.6 |
| TAP169396 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.2 |
| TAP139962 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.1 |
| UNKNOWN127533 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.9 |
| INDIANA MONUMENT & CUT STONE, LLC (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.8 |
| D & M TOOL CORP. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| PRD, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| UNKNOWN127543 | Substation-Adjacent | 161 kV | 100 MW | 3.8 yrs | 54.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ROGERS GROUP, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING), Lawrence County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.