UNKNOWN169431

Substation-Adjacent

JENNINGS, Indiana · PJM

DC Readiness
58.1
Good / 100

UNKNOWN169431 is a substation-adjacent datacenter candidate site in JENNINGS, Indiana, interconnecting through PJM. It screens at 58.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN169431
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDartPoints Columbus, IN - CLU1
IXP distance17.8 mi
Fiber providers9
Fiber coverage80.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterDatacenter 567894059
DC distance17.5 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.08¢/kWh
Industrial electricity8.90¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,620

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN169431

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
38
Fiber connectivity12%
82
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in JENNINGS, ranked by DC Readiness.

Sites near UNKNOWN169431
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124912Substation-Adjacent138 kV100 MW3.8 yrs59.0
TAP169430Substation-Adjacent161 kV100 MW3.8 yrs58.8
OZ JenningsGreenfield——3.0 yrs58.1
NORTH VERNONSubstation-Adjacent138 kV100 MW3.8 yrs57.4
UNKNOWN125515Substation-Adjacent69 kV50 MW3.8 yrs55.1
UNKNOWN125516Substation-Adjacent69 kV50 MW3.8 yrs55.0
TAP138347Substation-Adjacent69 kV50 MW3.8 yrs54.9
INDUSTRIAL MACHINE REPAIR, INC. (MACHINE SHOPS)Manufacturing——3.5 yrs54.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN169431, JENNINGS. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.