GEORGIA-PACIFIC GYPSUM, LLC (GYPSUM PRODUCT MANUFACTURING)
ManufacturingJASPER, Indiana
GEORGIA-PACIFIC GYPSUM, LLC (GYPSUM PRODUCT MANUFACTURING) is a manufacturing datacenter candidate site in JASPER, Indiana. It screens at 49.2/100 DC Readiness.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in JASPER, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| THAYER | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 66.5 |
| TAP160116 | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 62.8 |
| UNKNOWN160117 | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 62.4 |
| R M Schahfer | Brownfield | — | 1,096 MW | 3.0 yrs | 61.5 |
| EC Near Rensselaer City Light Plant | Greenfield | — | — | 3.0 yrs | 59.7 |
| EC Near Rensselaer City Light Plant | Greenfield | — | — | 3.0 yrs | 59.2 |
| EC Near R M Schahfer | Greenfield | — | — | 3.0 yrs | 59.0 |
| EC Near Herrema Dairy | Greenfield | — | — | 3.0 yrs | 58.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for GEORGIA-PACIFIC GYPSUM, LLC (GYPSUM PRODUCT MANUFACTURING), JASPER. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.