Datacenter Sites in DE KALB, Indiana

DE KALB has 98 scored datacenter candidate sites averaging 54.3/100 DC Readiness, with a catalogued aggregate of 2,050 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

98
Candidate sites
54.3/100
Avg DC Readiness
2,050 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in DE KALB

Site-selection context for DE KALB

Yessales_tax_exemption
Datacenter tax incentive
13.31¢/kWh
Commercial electricity
8.75¢/kWh
Industrial electricity
11
Fiber providers
Low
Water stress
$8,646
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in DE KALB

Top datacenter sites in DE KALB
SiteTypeVoltageCapacityQueue waitScore
COLLINGWOODSubstation-Adjacent345 kV600 MW3.8 yrs64.5
SOUTH BUTLERSubstation-Adjacent345 kV600 MW3.8 yrs63.1
OZ DeKalbGreenfield——3.0 yrs58.9
COUNTY LINESubstation-Adjacent138 kV100 MW3.8 yrs58.5
TAP155895Substation-Adjacent138 kV100 MW3.8 yrs58.5
UNKNOWN123170Substation-Adjacent138 kV100 MW3.8 yrs57.7
UNKNOWN123169Substation-Adjacent138 kV100 MW3.8 yrs57.7
AUBURN (138KV)Substation-Adjacent138 kV100 MW3.8 yrs57.5
UNKNOWN160238Substation-Adjacent138 kV100 MW3.8 yrs57.2
UNKNOWN150504Substation-Adjacent138 kV100 MW3.8 yrs56.9
BUTLERSubstation-Adjacent138 kV100 MW3.8 yrs56.8
BUTLER CENTERSubstation-Adjacent69 kV50 MW3.8 yrs56.3
ELECTRIC MOTORS & SPECIALTIES, INC. (MOTOR AND GENERATOR MANUFACTURING)Manufacturing——3.5 yrs55.1
WAYNE TOOL & DESIGN, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.5 yrs55.1
WAYNE MFG. CORP. (METAL STAMPING)Manufacturing——3.5 yrs55.1
WINDAMATIC SYSTEMS, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.5 yrs55.1
X-Y TOOL & DIE, INC. (NOT AVAILABLE)Manufacturing——3.5 yrs55.1
R D RUBBER PRODUCTS, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.2
ALPHA 3 MFG. CORP. (MACHINE SHOPS)Manufacturing——3.5 yrs54.2
M & S STEEL CORP. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing——3.5 yrs54.2
MOSSBERG INDUSTRIES, INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.2
ASSMANN CORP. OF AMERICA (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.2
GRIFFITH RUBBER MILLS OF GARRETT (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)Manufacturing——3.5 yrs54.2
MAVERICK MOLDING, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.2
MOMENTIVE SILICONES (ALL OTHER BASIC ORGANIC CHEMICAL MANUFACTURING)Manufacturing——3.5 yrs54.2

DE KALB datacenter FAQ

How many datacenter sites are in DE KALB?
98 scored datacenter candidate sites, averaging 54.3/100 DC Readiness.
Does DE KALB offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in DE KALB?
FEMA's National Risk Index rates DE KALB as "Relatively Moderate" (score 32).
What are industrial electricity rates in DE KALB?
Average industrial electricity is 8.75¢/kWh and commercial is 13.31¢/kWh in DE KALB.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DE KALB, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.