UNKNOWN127789

Substation-Adjacent

Crawford County, Indiana · PJM

DC Readiness
56.3
Good / 100

UNKNOWN127789 is a substation-adjacent datacenter candidate site in Crawford County, Indiana, interconnecting through PJM. It screens at 56.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN127789
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPHeyburn Building
IXP distance46.0 mi
Fiber providers5
Fiber coverage47.6%

Site characteristics

Land contactCrawford County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterHeyburn Building
DC distance46.0 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.54¢/kWh
Industrial electricity9.42¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$4,347

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN127789

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
33
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Crawford County, ranked by DC Readiness.

Sites near UNKNOWN127789
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125587Substation-Adjacent138 kV100 MW3.8 yrs57.0
OZ CrawfordGreenfield——3.0 yrs55.9
UNKNOWN127796Substation-Adjacent69 kV50 MW3.8 yrs53.6
TAP140393Substation-Adjacent69 kV50 MW3.8 yrs53.5
UNKNOWN127800Substation-Adjacent69 kV50 MW3.8 yrs53.0
TAP139956Substation-Adjacent69 kV50 MW3.8 yrs52.9
MULZER CRUSHED STONE, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs52.1
MULZER CRUSHED STONE, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN127789, Crawford County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.