Skip to content
Gridcensus

JEFFRIES PROPERTY

Industrial

BLACKFORD, Indiana · PJM

DC Readiness
48.3
Fair / 100

JEFFRIES PROPERTY is an industrial datacenter candidate site in BLACKFORD, Indiana, interconnecting through PJM. It screens at 48.3/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

UtilityINDIANA MICHIGAN POWER COinvestor ownedmoderate to large load · terms ≥ 70 MWLarge Load / Industrial Power tariff (≥70 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth406
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPLifeline Ft Wayne
IXP distance41.0 mi
Fiber providers5
Fiber coverage23.0%

Site characteristics

Site typeIndustrial
Land contactBlackford County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterORI.NET Noblesville
DC distance44.2 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.90¢/kWh
Industrial electricity8.44¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,810

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track JEFFRIES PROPERTY

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
42
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in BLACKFORD, ranked by DC Readiness.

Sites near JEFFRIES PROPERTY
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124109Substation-Adjacent138 kV100 MW3.0 yrs54.7
TRU-FORM STEEL & WIRE, INC. (CONVEYOR AND CONVEYING EQUIPMENT MANUFACTURING)Manufacturing——3.0 yrs48.4
INTERNATIONAL PAPER CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing——3.0 yrs48.4
HP PRODUCTS, INC. (METAL STAMPING)Manufacturing——3.0 yrs48.4
BRC RUBBER & PLASTICS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing——3.0 yrs48.4
INDIANA BOX CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing——3.0 yrs48.4
HARTFORD GLASS CO., INC. (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS)Manufacturing——3.0 yrs48.4
WOODPOINTE, INC. (HARDWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing——3.0 yrs48.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for JEFFRIES PROPERTY, BLACKFORD is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.