Former Clark #686
IndustrialBLACKFORD, Indiana · PJM
Former Clark #686 is an industrial datacenter candidate site in BLACKFORD, Indiana, interconnecting through PJM. It screens at 47.6/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Get alerts
Track Former Clark #686
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in BLACKFORD, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN124109 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 53.9 |
| HARTFORD GLASS CO., INC. (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS) | Manufacturing | — | — | 3.5 yrs | 50.3 |
| MIDDLETOWN ENTERPRISES, INC. (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS) | Manufacturing | — | — | 3.5 yrs | 50.3 |
| INDIANA BOX CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.3 |
| HARTFORD CONCRETE PRODUCTS, INC. (OTHER CONCRETE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.3 |
| HP PRODUCTS, INC. (METAL STAMPING) | Manufacturing | — | — | 3.5 yrs | 50.3 |
| BRC RUBBER & PLASTICS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.3 |
| TRU-FORM STEEL & WIRE, INC. (CONVEYOR AND CONVEYING EQUIPMENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Former Clark #686, BLACKFORD. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.