Mine Site

Former Mine

White, Illinois · PJM

DC Readiness
42.3
Fair / 100

Mine Site is a former mine datacenter candidate site in White, Illinois, interconnecting through PJM. It screens at 42.3/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth56

Connectivity

Nearest IXPSITCO Evansville
IXP distance25.5 mi

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterSITCO Evansville
DC distance25.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.26¢/kWh
Industrial electricity5.53¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$5,590

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in White, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
NORRIS CITY NORTHSubstation-Adjacent345 kV600 MW4.6 yrs68.6
Greenfield (WEST FRANKFORT EAST - NORRIS C)Greenfield345 kV600 MW4.6 yrs60.9
EC Near CarmiGreenfield4.6 yrs59.1
EC Near CarmiGreenfield4.6 yrs58.6
EC Near CarmiGreenfield4.6 yrs58.1
EC Near CarmiGreenfield4.6 yrs57.7
EC Near CarmiGreenfield4.6 yrs57.4
EC Near CarmiGreenfield4.6 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, White. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.