Skip to content
Gridcensus

UNKNOWN122407

Substation-Adjacent

St. Clair County, Illinois · PJM

DC Readiness
56.7
Good / 100

UNKNOWN122407 is a substation-adjacent datacenter candidate site in St. Clair County, Illinois, interconnecting through PJM. It screens at 56.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN122407
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilitySOUTHWESTERN ELECTRIC COOP INC - (IL)cooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPNetrality St. Louis - 900 Walnut
IXP distance28.8 mi
Fiber providers10
Fiber coverage37.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterTierPoint St Louis
DC distance29.1 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.18¢/kWh
Industrial electricity3.59¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$9,310

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN122407

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
49
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in St. Clair County, ranked by DC Readiness.

Sites near UNKNOWN122407
SiteTypeVoltageCapacityQueue waitScore
OZ St. ClairGreenfield——4.6 yrs64.3
TURKEY HILLSubstation-Adjacent345 kV600 MW3.8 yrs64.2
Belleville Landfill ProjectBrownfield138 kV13 MW3.8 yrs64.0
UNKNOWN157809Substation-Adjacent138 kV100 MW3.8 yrs59.5
TAP156135Substation-Adjacent138 kV100 MW3.8 yrs59.5
PORTER RDSubstation-Adjacent138 kV100 MW3.8 yrs59.4
E BELLEVILLESubstation-Adjacent138 kV100 MW3.8 yrs59.2
S BELLEVILLESubstation-Adjacent138 kV100 MW3.8 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN122407, St. Clair County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.