ACF Site

Industrial

St. Clair County, Illinois · PJM

DC Readiness
46.9
Fair / 100

ACF Site is a industrial datacenter candidate site in St. Clair County, Illinois, interconnecting through PJM. It screens at 46.9/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth265

Connectivity

Nearest IXPNetrality St. Louis - 900 Walnut
IXP distance1.2 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterTierPoint
DC distance1.4 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.18¢/kWh
Industrial electricity3.59¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$9,310

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
78
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in St. Clair County, ranked by DC Readiness.

Sites near ACF Site
SiteTypeVoltageCapacityQueue waitScore
TURKEY HILLSubstation-Adjacent345 kV600 MW4.6 yrs71.9
PORTER RDSubstation-Adjacent138 kV100 MW4.6 yrs68.3
TAP156135Substation-Adjacent138 kV100 MW4.6 yrs68.1
Greenfield (PRAIRIE STATE STATION - JARVIS)Greenfield345 kV600 MW4.6 yrs66.1
Belleville Landfill ProjectBrownfield13 MW65.9
UNKNOWN157809Substation-Adjacent138 kV100 MW4.6 yrs65.8
TAP169374Substation-Adjacent138 kV100 MW4.6 yrs65.8
E BELLEVILLESubstation-Adjacent138 kV100 MW4.6 yrs65.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ACF Site, St. Clair County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.