TAP138536 is a substation-adjacent datacenter candidate site in Menard County, Illinois, interconnecting through PJM. It screens at 56.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP138536
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityMENARD ELECTRIC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSFN IL-Peoria
IXP distance40.7 mi
Fiber providers6
Fiber coverage69.4%

Site characteristics

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone A (SFHA)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score50/100

Location context

Nearest datacenterSFN IL-Peoria
DC distance40.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.88¢/kWh
Industrial electricity8.62¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$9,257

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track TAP138536

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
49
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
50
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Menard County, ranked by DC Readiness.

Sites near TAP138536
SiteTypeVoltageCapacityQueue waitScore
EC Coal Menard CountyGreenfield——4.6 yrs57.6
TAP138528Substation-Adjacent138 kV100 MW3.8 yrs57.0
EC FFE Menard CountyGreenfield——4.6 yrs56.3
Greenfield (INTERSTATE - TAP138536)Greenfield138 kV100 MW1.0 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138536, Menard County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.