118 E. Main St. (East Parcel)

Industrial

Hancock County, Illinois · PJM

DC Readiness
50.1
Fair / 100

118 E. Main St. (East Parcel) is an industrial datacenter candidate site in Hancock County, Illinois, interconnecting through PJM. It screens at 50.1/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityWESTERN ILLINOIS ELEC COOPnot available

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSFN IA-Davenport
IXP distance69.1 mi
Fiber providers7
Fiber coverage69.6%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterSFN IA-Davenport
DC distance69.1 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.67¢/kWh
Industrial electricity3.10¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$9,460

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track 118 E. Main St. (East Parcel)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Hancock County, ranked by DC Readiness.

Sites near 118 E. Main St. (East Parcel)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN122593Substation-Adjacent138 kV100 MW3.8 yrs56.4
UNKNOWN133904Substation-Adjacent161 kV100 MW2.8 yrs56.2
UNKNOWN132660Substation-Adjacent161 kV100 MW2.8 yrs56.1
EC FFE Hancock CountyGreenfield——4.6 yrs55.4
EC Coal Hancock CountyGreenfield——4.6 yrs55.1
EC Coal Hancock CountyGreenfield——4.6 yrs54.5
UNKNOWN159156Substation-Adjacent69 kV50 MW3.8 yrs54.0
TAP138524Substation-Adjacent69 kV50 MW3.8 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for 118 E. Main St. (East Parcel), Hancock County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.