TAP155734 is a substation-adjacent datacenter candidate site in Gallatin County, Illinois, interconnecting through PJM. It screens at 54.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP155734
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySOUTHEASTERN IL ELEC COOP, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSITCO Evansville
IXP distance40.3 mi
Fiber providers4
Fiber coverage47.4%

Site characteristics

Land contactGallatin County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterSITCO Evansville
DC distance40.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.68¢/kWh
Industrial electricity5.74¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$5,746

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP155734

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
49
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Gallatin County, ranked by DC Readiness.

Sites near TAP155734
SiteTypeVoltageCapacityQueue waitScore
EC FFE Gallatin CountyGreenfield——4.6 yrs57.6
EC Coal Gallatin CountyGreenfield——4.6 yrs57.2
UNKNOWN121871Substation-Adjacent161 kV100 MW3.8 yrs57.2
OZ GallatinGreenfield——4.6 yrs56.5
TAP160209Substation-Adjacent69 kV50 MW3.8 yrs55.2
UNKNOWN160215Substation-Adjacent69 kV50 MW3.8 yrs55.2
TAP160212Substation-Adjacent69 kV50 MW3.8 yrs54.7
TAP160210Substation-Adjacent69 kV50 MW3.8 yrs54.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TAP155734, Gallatin County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.