UNKNOWN120267

Substation-Adjacent

Orange County, Florida · SERC

DC Readiness
58.9
Good / 100

UNKNOWN120267 is a substation-adjacent datacenter candidate site in Orange County, Florida, interconnecting through SERC. It screens at 58.9/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN120267
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPColo Solutions Downtown Orlando
IXP distance8.0 mi
Fiber providers20
Fiber coverage71.0%

Site characteristics

Land contactOrange County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterColo Solutions Downtown Orlando
DC distance8.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.20¢/kWh
Industrial electricity9.41¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$10,106

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN120267

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
65
Fiber connectivity12%
86
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.

Sites near UNKNOWN120267
SiteTypeVoltageCapacityQueue waitScore
SKY LAKESubstation-Adjacent230 kV300 MW3.7 yrs66.9
UNKNOWN120236Substation-Adjacent230 kV300 MW3.7 yrs66.8
CONVENTION CENTERSubstation-Adjacent230 kV300 MW3.7 yrs66.8
RISER143336Substation-Adjacent230 kV300 MW3.7 yrs66.6
STANTONSubstation-Adjacent230 kV300 MW3.7 yrs66.4
ALTAMONTE SPRINGSSubstation-Adjacent230 kV300 MW3.7 yrs66.0
MEADOW WOODS SOUTHSubstation-Adjacent230 kV300 MW3.7 yrs66.0
UNKNOWN120225Substation-Adjacent230 kV300 MW3.7 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN120267, Orange County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.