Hobgood/ESP Warehouse

Industrial

Hamilton County, Florida · SERC

DC Readiness
51.9
Fair / 100

Hobgood/ESP Warehouse is an industrial datacenter candidate site in Hamilton County, Florida, interconnecting through SERC. It screens at 51.9/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPCologix JAX1
IXP distance77.4 mi
Fiber providers3
Fiber coverage88.4%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterHiPerGator
DC distance69.8 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.09¢/kWh
Industrial electricity8.30¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$4,547

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
75
Fiber connectivity12%
73
Energy cost10%
50
Water risk8%
76
Natural hazard8%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hamilton County, ranked by DC Readiness.

Sites near Hobgood/ESP Warehouse
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120444Substation-Adjacent230 kV300 MW1.0 yrs58.0
OZ HamiltonGreenfield3.6 yrs55.5
UNKNOWN172549Substation-Adjacent115 kV100 MW1.0 yrs55.0
TAP143313Substation-Adjacent115 kV100 MW1.0 yrs55.0
UNKNOWN107692Substation-Adjacent115 kV100 MW1.0 yrs54.2
UNKNOWN173477Substation-Adjacent115 kV100 MW1.0 yrs54.2
UNKNOWN108302Substation-Adjacent115 kV100 MW1.0 yrs54.2
SWIFT CREEKSubstation-Adjacent115 kV100 MW1.0 yrs54.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hobgood/ESP Warehouse, Hamilton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.