71 Hargrove Grade (Sunbelt Chemical Plant) is a industrial datacenter candidate site in Flagler County, Florida, interconnecting through SERC. It screens at 42.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPTierPoint Jacksonville
IXP distance49.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterTierPoint Jacksonville
DC distance49.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.01¢/kWh
Industrial electricity8.09¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$6,070

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Flagler County, ranked by DC Readiness.

Sites near 71 Hargrove Grade (Sunbelt Chemical Plant)
SiteTypeVoltageCapacityQueue waitScore
EAGLESubstation-Adjacent230 kV300 MW3.6 yrs71.0
UNKNOWN120541Substation-Adjacent230 kV300 MW3.6 yrs70.7
Greenfield (DUVAL - POINSETT)Greenfield500 kV1,000 MW3.6 yrs68.3
Greenfield (DUVAL - POINSETT)Greenfield500 kV1,000 MW3.6 yrs66.8
PELLICERSubstation-Adjacent230 kV300 MW3.6 yrs66.6
UNKNOWN120435Substation-Adjacent115 kV100 MW3.6 yrs66.5
BUNNELLSubstation-Adjacent230 kV300 MW3.6 yrs65.9
UNKNOWN108300Substation-Adjacent115 kV100 MW3.6 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for 71 Hargrove Grade (Sunbelt Chemical Plant), Flagler County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.